1.The bucket shaft sleeve of this instrument is an integrated positioning structure. The bucket is installed in the shaft bearing through the bucket shaft. The internal structure of this instrument is assembled when it leaves the factory, and there is no need to install the internal structure on site, which brings convenience to on-site installation
2.The bucket of this instrument is a three-dimensional streamlined design, and is designed with a drooping arc-shaped guide tip. Its shape is beautiful and smooth, the water-turning performance is better, and it is easy to clean and maintain
3.The bucket of this instrument is equipped with a magnet, and the reed switch is installed on the reed switch bracket. When the instrument leaves the factory, the magnet and the reed switch are adjusted to a suitable coupling distance, so that the output signal of the instrument has a certain proportional relationship with the number of bucket flips
Outdoor installation and commissioning
Make the installation foundation
As shown in the figure: When installing on the outdoor ground and roof, the cement installation foundation should be made according to the dimensions and requirements of the diagram, and the upper surface of the cement foundation should be horizontal. The size of the cement installation foundation is generally a 40cm×40cm square base with a height of not less than 30cm or a circular base with a diameter of 40cm. The height of the instrument's rain receiving opening is required to be 70cm from the ground plane, and it is required that no shielding higher than the instrument's rain receiving opening is allowed within 3 to 5 meters around the instrument opening.
Install and fix the instrument and adjust the level of the rain receiving opening
According to the dimensions of Figure 3, make 3 φ10 installation holes with a depth of 8 to 10cm on the cement foundation, place the expansion bolts in the installation holes, lock them with locking nuts, and then install the instrument base on the 3 height-adjusting support nuts. By adjusting the height of the support nuts and measuring whether the ring opening is in a horizontal state with a level ruler, the instrument is finally fixed with a lock.
Indoor installation and debugging
As shown in the figure: Take out the pearl cotton block at the bottom of the instrument, and then install the matching block to the bottom of the instrument.